No. 188 Jinliu Road, High-tech Zone, Jinshan District, Shanghai City, China +86-15001719145 sales@seize-air.com
Follow Us -
Products
Low-Pressure PM VSD Oil Free Screw Blower
  • Low-Pressure PM VSD Oil Free Screw BlowerLow-Pressure PM VSD Oil Free Screw Blower
  • Low-Pressure PM VSD Oil Free Screw BlowerLow-Pressure PM VSD Oil Free Screw Blower
  • Low-Pressure PM VSD Oil Free Screw BlowerLow-Pressure PM VSD Oil Free Screw Blower
  • Low-Pressure PM VSD Oil Free Screw BlowerLow-Pressure PM VSD Oil Free Screw Blower

Low-Pressure PM VSD Oil Free Screw Blower

Low-Pressure PM VSD Oil Free Screw Blower for a defined process retrofit. Compare SPVC pressure-specific delivery, retained piping, control sequences and service scope.

    A replacement blower should be selected from the process duty that exists today, rather than by copying the motor rating of the machine being removed. The Low-Pressure PM VSD Oil Free Screw Blower is a SEIZE AIR SPVC option for a defined low-pressure air task. Start with the process airflow, the resistance the blower must overcome and the operating sequence. Then compare the catalogue pressure rows with the equipment, connections and control functions the plant intends to retain. This approach makes the retrofit an engineering proposal that purchasing and maintenance can review together.

    Complete SPVC-200A blower photographed in the factory
    Complete SPVC-family oil-free screw blower in the factory; catalogue data below covers the specified model selections.

    Reconstruct the existing duty before specifying a replacement

    Identify what the old machine actually supplies

    Begin with the existing blower identification and available operating records. Record where pressure and airflow are observed and which process state those readings represent. A motor nameplate is useful identification, but it does not establish useful air delivery at the process connection. The operating point can have changed since the original installation because the process, pipework or control sequence changed.

    Ask why the replacement is being considered. A capacity increase, maintenance problem and need for different control behaviour lead to different technical questions. State the intended outcome in the enquiry and preserve the operating evidence behind it. A request that merely substitutes a new motor size can reproduce an unresolved problem or overlook the external work required to achieve the intended result.

    Map the retained air path from intake to process

    Show the intake arrangement, blower, discharge route, valves, instruments and connected process equipment. Identify the measurement and supply boundaries. Where several branches join a common header, show which can operate together and how they are isolated. The drawing should distinguish retained equipment from the proposed new scope so the supplier knows what its package will connect to.

    Do not assume the old connections are suitable because they are close to the proposed machine. The selected outlet and operating duty need to be carried into the pipework review. A connection can be physically adaptable while the retained arrangement creates an unacceptable loss or control problem. Assign the external design and inspection work to a responsible party instead of leaving the installer to interpret an equipment quotation as a complete piping design.

    Separate process changes from changed resistance

    A higher pressure reading can result from a different process requirement or increased resistance along the air path. Record what equipment and branches are active when comparing observations. If the process has acquired additional distribution devices or a modified route, include those changes in the enquiry. An old operating record may no longer describe the duty the replacement must serve.

    For an observed change, capture the sequence before assigning a cause. Identify whether it appeared after maintenance, a new production campaign or a change in valve position. A pressure value by itself cannot tell the supplier which part of the system needs investigation. Comparable observations help distinguish a legitimate new duty from a restriction that should be resolved before selecting additional equipment.

    Agree what production must continue during the retrofit

    State whether the installation can be stopped, transferred to another source or commissioned in stages. Identify the equipment and services needed for the alternative arrangement. A nominal spare blower is not a complete continuity plan if its connections, available capacity or supporting utilities cannot serve the required process state. The plant team should review the permitted sequence and the conditions required to return to normal operation.

    Keep this requirement distinct from the normal capacity selection. A backup duty may use a different combination of branches or a reduced production state. Explain it in the enquiry so the supplier can identify what belongs to the package and what needs external integration. This makes the purchasing comparison more useful than adding a reserve allowance without describing how it will actually be supplied.

    Choose the SPVC row that matches process pressure

    Published delivery belongs to a stated pressure

    The selection below uses the technical sheet in the SEIZE AIR English oil-free screw blower catalogue, edition 2025.10. Capacity ranges are listed at the pressure above each column. The power entry is catalogue equipment information, separate from a measured whole-system electrical result. Keep the required pressure and delivery basis together when comparing the offer with process records or another supplier's data.

    For SPVC-75A, the catalogue gives 34.8–58.0 m³/min at 0.8 bar and 30.0–50.0 m³/min at 1.0 bar. At 1.5 bar the listed range is 19.2–32.0 m³/min. These entries are different operating selections, not interchangeable capacity descriptions. A proposal for the higher pressure should not carry the largest airflow from the lower pressure row.

    Model Catalogue power, kW FAD at 0.6 bar, m³/min At 0.8 bar At 1.0 bar At 1.5 bar
    SPVC-22A 22 10.8–18.0 8.7–14.5 6.6–11.0 —
    SPVC-37A 37 19.2–32.0 15.0–25.0 13.2–22.0 9.0–15.0
    SPVC-55A 55 30.9–51.5 25.2–42.0 21.6–36.0 15.0–25.0
    SPVC-75A 75 40.2–67.0 34.8–58.0 30.0–50.0 19.2–32.0
    SPVC-90A 90 46.8–78.0 40.2–67.0 37.8–63.0 26.4–44.0
    SPVC-110A 110 60.0–100.0 46.9–78.0 40.8–68.0 30.0–50.0

    Compare flow on a compatible reference basis

    The source footnote states complete-package free air delivery in accordance with ISO 1217 Annex C, with absolute inlet pressure of 1 bar and intake temperature of 20°C. State the basis of existing flow measurements before using them in the comparison. Volume expressed at process conditions may differ from a free-air quantity even when both use cubic metres per minute.

    Identify the pressure units and whether a measurement is gauge or absolute wherever the distinction matters. The catalogue's absolute inlet reference and its process-pressure columns describe different parts of the selection. Keeping both explicit prevents a conversion from silently changing the meaning of the requirement. Where an instrument record lacks the reference information, ask its provider to establish the basis rather than treating the number as confirmed selection data.

    Check the quiet production state as carefully as the normal state

    The required duty may change with active branches, process loading or production schedules. Submit the minimum useful state, normal demand and higher-demand condition with their duration and required pressure. A range printed in the catalogue is useful equipment information; it does not describe every transition or the complete operating strategy of an installed system.

    The Low-Pressure PM VSD Oil Free Screw Blower uses a variable-speed drive to adjust operation within the supplied arrangement. Confirm what happens when demand falls below normal modulation and when it resumes. Keep a motor frequency range distinct from a delivery fraction. A drive percentage does not establish the useful flow available at every pressure or the behaviour of the connected process.

    Use the selected configuration for the mechanical review

    The mechanical table below shows selected catalogue entries at 1.0 bar. The pressure configuration can affect outlet size, mass and dimensions. For SPVC-55A at 1.0 bar, the source gives DN150, 2440 × 1255 × 1870 mm and 1950 kg. At 0.6 bar, the same model name is associated with DN200, 2890 × 1530 × 2360 mm and 3100 kg.

    Carry the offered configuration into the final layout and connection schedule. The model name alone is insufficient for a retrofit that must fit an existing space. Request the arrangement drawing, service requirements and handling information before fixing the installation plan. Equipment dimensions are an early reference, not an instruction for lifting, foundation design or component-removal clearance.

    Model at 1.0 bar Outlet L × W × H, mm Mass, kg
    SPVC-22A DN150 2440 × 1255 × 1870 1400
    SPVC-37A DN150 2440 × 1255 × 1870 1600
    SPVC-55A DN150 2440 × 1255 × 1870 1950
    SPVC-75A DN200 2890 × 1530 × 2360 3300
    SPVC-90A DN200 2890 × 1530 × 2360 3400
    SPVC-110A DN200 2890 × 1530 × 2360 3500

    Turn the process sequence into a control requirement

    Identify which signal requests more or less air

    A plant may regulate pressure, airflow or a process outcome using a wider control arrangement. Identify the variable that asks the blower to change operation and the controller responsible for it. State where the signal comes from, what it represents and which equipment owns the response. A request for automatic control is incomplete unless the parties understand what the system is being asked to maintain.

    Provide relevant details of retained instruments and controllers. A general communication label does not prove compatibility or define the functions supplied. Ask the bidder to identify its interface scope and any external work needed. The functional description should make normal operation understandable to both the process team and the personnel installing the electrical and control connections.

    Describe branch changes as sequences rather than isolated states

    A process can have an acceptable steady duty before and after a branch change while still creating a difficult transition. Explain which valve, process machine or command changes first and what the air system is expected to do. Include startup and the end of a production cycle where those states affect the supply requirement.

    Keep the process designer involved in defining permitted states and protective behaviour. The proposal should identify what the blower package does and what remains under process control. An acceptance plan can then check the agreed sequence instead of testing only the machine at one convenient pressure. This is particularly important in a retrofit where the new package may respond differently from the equipment it replaces.

    Coordinate several machines on a shared header

    If other blowers remain connected, define the normal roles and how responsibility changes when another machine enters or leaves service. Identify the relevant pressure references, requests and available-status information. Individually suitable machines do not automatically create a suitable station. Their combined arrangement needs a defined operating sequence across the production states that matter.

    Consider reduced production as well as the busiest state. The plant should know which machine responds to a changing load and which equipment can stop when it has no useful role. Describe what happens if a unit is unavailable or an interface signal is lost. Confirm the supplied functions in the offer rather than assuming the retained station controller or the new package will perform every required action.

    Agree how protection will be demonstrated

    The responsible suppliers should identify the applicable protective functions and the procedure for verifying the supplied arrangement. Do not improvise an operating condition by closing a live discharge simply to observe a response. The commissioning plan should name the authorised personnel, relevant indications and permitted checks for the offered equipment and process interface.

    Preserve the distinction between the observed event and its cause. A protective response can follow a changed process state, utility condition or equipment issue. Keep the command sequence and relevant readings with the event record before authorised adjustments. This provides a usable basis for investigation and helps prevent a revised setting from concealing the original problem without establishing what changed.

    Review the compression and lubrication boundaries

    Oil-free compression and drive lubrication are separate tasks

    Drive-side components in an SPVC package
    Factory component photograph supporting review of the mechanical drive arrangement; not a performance test.

    The SPVC catalogue describes an oil-free screw compression arrangement with lubrication for transmission components separated from the compression chamber. This explains how an oil-free air path and a lubrication service requirement can exist in the same package. The term oil-free should not lead the maintenance team to omit work specified for the mechanical drive system.

    Request the instructions and component identification applicable to the supplied configuration. Keep air-path, lubricant and cooling connections distinguishable in the drawings and service records. Where the process has a specified delivered-air condition, identify the requirement at its actual connection. The compression principle describes one boundary; the complete process-air requirement may also involve intake conditions, downstream equipment and a defined verification method.

    Use internal photographs to plan questions, not infer specifications

    The photographs on this page show a related SPVC factory package. They help a buyer discuss the physical arrangement and access, while the catalogue selection and offered drawing govern the quoted duty. Do not assign a component interval or exact model configuration solely from an image. Fitted component identification is the useful reference when planning spares or a service visit.

    Where an existing machine has suffered a recurring issue, provide the operating and service history to the responsible technical team. Separate the observed symptom from an unverified diagnosis. A package of photographs can clarify a connection or access restriction, but it does not replace the measurements and configuration needed to assess the cause or specify a replacement.

    Preserve the lubrication-service scope

    Separate lubrication pump assembly in an SPVC package
    Factory photograph of an auxiliary pump and connected piping, supporting the separate lubrication-service discussion.

    The applicable maintenance documents should identify the lubricant, inspection tasks and service procedures for the offered equipment. Ask for a spare-parts recommendation tied to that configuration and the intended operating conditions. A visually similar part used elsewhere in the plant may not be the correct replacement. Keep the machine identification with each service record and order.

    Plan access and isolation for actual work, not only visual inspection. Component removal may need space beyond an open cabinet door. Confirm who can authorise the work and how the process will remain safe and available during the required stop. This makes maintenance a practical part of the equipment selection rather than a later problem assigned to the people who receive the machine.

    Review the intake environment at normal production

    The catalogue describes pre-filtration and an intake filter in the suction arrangement. Give the supplier the expected intake environment, including nearby dust sources and exhausts that change during production. A clean room photographed while equipment is stopped may not represent the air available during material handling or cleaning operations.

    Confirm the applicable intake and maintenance requirements for the selected package. Preserve access to filter components and avoid placing an intake where the installation predictably draws in another machine's hot discharge. If an external intake arrangement is proposed, have the responsible designers review it for the offered equipment rather than treating any convenient pipe route as a complete suction design.

    Make the replacement fit the plant without carrying over old restrictions

    Review connections as part of the retained system

    Carry the selected outlet and duty into the external piping review. Identify support, isolation, movement accommodation and measurement locations as applicable to the design. The responsible installer should use the supplied connection information rather than make the blower casing support an improvised assembly of pipework or valves.

    An existing connection diameter does not establish the appropriate design for the proposed flow and pressure. Review the route and its components, including any known problem that motivated the retrofit. A project may otherwise install a capable new package while retaining the same restriction that limited production. Identify who designs and supplies each change and which drawing establishes the final interface.

    Keep cooling paths usable after installation

    The catalogue illustrates side cooling-air intake and top discharge. Obtain the applicable installation information for the offered package and review the surrounding room conditions. Walls, ducting and adjacent heat sources can affect the usable air path. A cabinet that fits the floor space may still be poorly placed for cooling or service.

    Where the plant proposes an enclosure or cooling duct, have the arrangement reviewed for the actual machine. Do not transfer a temperature or clearance limit from another product. The final layout should show the relevant intake, discharge and service areas so that later storage, construction or other equipment does not quietly remove a function needed by the installed blower.

    Confirm site electrical and auxiliary requirements

    The catalogue footnote lists a standard supply of 380 V / 50 Hz / three phase and notes that other voltages are available. Give the supplier the actual site supply and installation requirements. Request the final electrical schedule for the offered configuration; a catalogue power entry does not define the complete feeder, protection or auxiliary scope.

    If an existing feeder, panel or instrument is retained, have the responsible electrical designer assess it against the proposed equipment. Define the functions and indications required by the plant. Keep drawings and the functional description aligned through revisions so that the installed wiring, controls and equipment offer describe the same system at commissioning.

    Use final documents for receiving and handling

    Review the route from unloading to final position using the supplied packing and handling information. Include openings, turning space and conflicts with production or other installation work. The selected catalogue dimensions and mass are useful for initial planning, while the actual supplied arrangement governs movement and placement.

    On arrival, match equipment identification and supplied items to the order. Preserve the observed transport condition and keep documents and accessories associated with the correct machine. Resolve discrepancies while the equipment is accessible. These checks support the installation schedule and reduce the chance that commissioning is delayed by an item each party assumed was already included or available at the site.

    Measure retrofit performance on a useful process boundary

    Compare the same job before and after

    Identify the useful process duty, reference conditions and electrical boundary for the baseline and proposed arrangement. A lower motor rating is not, by itself, proof of a lower operating cost. Pressure, useful airflow, process state and auxiliary equipment need to be compatible before electrical observations can be compared meaningfully.

    Where a station contains several blowers, record how the remaining equipment responds to the replacement. A change in duty allocation can affect the total input independently of the new package's quoted performance. Keep the evidence for that operating pattern with the comparison. If some figures are estimates, label them and state the assumptions instead of presenting a precise annual result unsupported by the available records.

    Use operating intervals rather than a generic saving percentage

    Average electrical input in kilowatts multiplied by operating time in hours gives energy in kilowatt-hours for an interval. Group intervals around the process states that matter, using actual operating records where available. Keep any quoted performance point tied to the conditions under which it applies. A single point should not be assumed to represent every production state across a year.

    Include equipment inside the agreed comparison boundary consistently. If another offer includes an auxiliary outside the blower cabinet, identify it instead of comparing the cabinet-only figure with a wider system total. Use the plant's electricity terms for cost estimates and distinguish energy charges from other billing elements. The purchasing decision should show where the numbers came from and which uncertainty could change the result.

    Check whether the project changes process operation

    If the new supply is expected to change production performance, have the process designer identify the evidence and verification method required. Blower delivery alone does not establish material throughput, treatment performance or another process outcome. Keep the air-duty acceptance and the process-performance requirement connected through the project documents, with each responsibility assigned.

    Where the process will operate differently after the retrofit, state that difference in the comparison. A changed production schedule can be an intended benefit, but it should not be hidden inside a claim of equipment efficiency at the same duty. Separating the cases helps purchasing understand whether the project is improving supply, changing how the process runs or doing both.

    Commission the sequence and preserve a repeatable baseline

    Record the offered configuration and the observed condition

    Follow the applicable installation and startup instructions with the responsible personnel. Confirm the supplied equipment identification and interfaces before making performance observations. Record the active branches, process state, measurement locations and airflow reference. If electrical input is included, identify the equipment boundary. These details allow a later shift or service team to interpret the result.

    Demonstrate the operating states that drove the selection where they are available. If the full process cannot run at the first visit, identify the remaining checks instead of treating a convenient unloaded demonstration as completion. The record should distinguish physical observations, reviewed documents and open verification items. Give each open item a responsible owner and a relevant condition for closing it.

    Capture a transient problem before changing settings

    An issue that appears only during a branch change or process stop needs its sequence preserved. Record the command, equipment state and indications before and after the event. The same machine may appear normal when observed later at steady production. A useful record gives the service team the conditions that reproduce the complaint rather than only its final alarm message.

    Observation Record together Question to resolve
    Pressure changes at similar process duty Branch states and relevant readings Changed resistance or supply condition
    Issue follows a branch transition Command and response sequence Control interface and timing
    A process reports less useful air Flow basis, pressure and active users Useful supply versus changed demand
    Thermal indication changes Cooling environment and machine duty Installation or operating change

    Any authorised adjustment should be documented with its reason and checked under a comparable state where practicable. Keep the final settings and functional description aligned with the equipment handed over. This provides a reliable starting point for future maintenance instead of leaving a commissioning workaround that nobody can later explain.

    Hand over the service plan with the control description

    Internal SPVC package service view
    Factory view of the internal compression and connected equipment area; final drawings and fitted-component documents govern servicing.

    Operators need normal indications, permitted actions and a clear reporting route when behaviour changes. Maintenance needs the fitted component information, applicable tasks and isolation arrangements. Keep these records linked to the actual machine so that a familiar-looking cabinet elsewhere in the plant does not become an accidental source of parts or procedure assumptions.

    Include the process continuity arrangement for planned service. Identify the alternative source, permitted connection and checks required to restore normal operation where applicable. The plant should know which shared utilities remain available and who authorises a transition. A spare unit on an equipment list becomes useful only when its air path and supporting services can serve the stated duty.

    Send a retrofit enquiry that can be answered precisely

    What if the new blower must match an existing footprint?

    State the actual restrictions, including delivery access, connection positions and required service space. Provide a drawing or measured layout rather than asking for a machine to match the old motor power. The catalogue demonstrates that even one SPVC model name can have different mechanical entries at different pressures. Ask the supplier to identify the offered configuration and final drawing before the plant commits to external piping or construction.

    Where the required duty and the existing space conflict, keep that conflict visible in the proposal review. A change in location, pipe route or maintenance arrangement may be preferable to forcing a selection into an unsuitable envelope. Assign the design decision to the responsible parties and retain it with the final installation documents so that the physical limitations are understood during service.

    What information should purchasing send to the manufacturer?

    For a Low-Pressure PM VSD Oil Free Screw Blower, send pressure and airflow with their reference basis, the process description and the operating sequence. Add the retained equipment, control information, electrical supply and layout. Explain the problem the retrofit must resolve and the production state that must continue during installation or service. Include any required air-quality documentation and process acceptance criteria.

    SEIZE AIR is a compressor and blower manufacturer in China. Ask the factory or supplier to return a pressure-specific selection, equipment and interface scope, relevant drawings and the proposed acceptance basis. That gives engineering a defined duty to assess and purchasing a consistent comparison. The proposal should explain how the new machine fits the retained system and which external work is still required before it can serve production.

    Which existing measurements should be checked before they become acceptance instruments?

    Identify the instruments the project intends to retain, their location, measurement range and available calibration information. The responsible team should determine whether they are suitable for the duty and the acceptance method. A display on an old panel may remain useful for operation while not providing the information needed for a contractual comparison. Keep those roles distinct so neither party assumes that a convenient existing indication automatically defines the performance test.

    Check the reference used by a flow instrument and the pressure basis used in the process documents. Where instruments record at different times, agree how the observations will be aligned with the same operating event. If information is missing, identify the gap before promising a precise comparison. The acceptance plan can then specify an appropriate measurement arrangement, or clearly state which check is observational rather than a measurement of the quoted performance.

    How can a staged replacement preserve useful evidence?

    If the plant transfers branches in stages, record which users are connected at every stage and how the remaining equipment operates. A partial transfer can be useful for checking installation and controls, but its load may differ substantially from the final duty. Preserve the distinction when interpreting the machine's response or electrical input. Otherwise, a successful test with a small group of users can become an unintended claim about the whole process.

    After the final connection, review the agreed normal and transition states with the completed arrangement. Keep any changed settings or interface decisions with the final functional description. Where production cannot demonstrate an important state immediately, assign a later verification item rather than allowing it to disappear from the record. This gives the plant and supplier a common account of what was installed, what was observed and what remains to be proven under the actual process duty.

    SEIZE AIR company and manufacturing overview. This official company introduction provides manufacturer context; the catalogue table defines the models selected above.

    Send Inquiry
    Contact Info
    For inquiries about Oil-Injected Screw Air Compressor, Oil-Free Screw Air Compressors, Gear-Type Centrifugal Air Compressor or price list, please leave your email to us and we will be in touch within 24 hours.
    X
    We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
    RejectAccept